Detection RMCNotification RMCEnclosed cable trayUndergroundLELH2O2COFlameJB / transition8-ft trapeze support
GDGas detectorFDFlame detectorYBYellow beaconRBRed beaconHSHorn / strobeJBJunction boxRMCRigid metal conduitCTEnclosed cable tray
B307B → underground detection + notification → main JBB307 perimeter RMC · 45′ eaves / 50′ ridgeEnclosed cable tray continues to fuel-yard end at +3′ · vertical RMC to devices
Site isometric · Full vertical orbit · One finger rotates · Pinch to zoom
Finished floor0′-0″Approach tray+18′-0″Fuel-yard tray+3′-0″Side eaves+45′-0″Center ridge+50′-0″
Point inspector

Hover over an item or tap it to see Elevation and Conduit distance.

02

Installation scope

Owner-furnished devices with contractor-furnished raceway, conductors, boxes, fittings, supports, and complete installation.

17

Gas-detector points

LEL · H2 · O2 · CO

04

Flame detectors

Sense-Ware UV/IR

14

Safety beacons

7 yellow · 7 red

02

Horn / strobes

White combination units

03

Device branch-run conduit takeoff

Approximate centerline lengths measured from the modeled branch geometry, grouped by raceway system.

SystemBranch runsModeled conduitAverage per run
Detection21512 ft24.4 ft
Notification16298 ft18.6 ft
Combined total37810 ft21.9 ft

Branch-run quantity includes 17 gas detectors, 4 flame detectors, 14 beacons, and 2 horn/strobes. Horizontal branches are supported with strut and all-thread trapezes at maximum 8-ft spacing; vertical drops use column-mounted strut clamps. The takeoff excludes shared perimeter RMC, general column drops, B307B underground feeders, exterior cable tray, fittings, field offsets, rack steel, support hardware, and material waste. Verify all lengths in the field before purchasing.

04

Support racks & hardware

Conceptual quantities generated from the modeled branch supports and the +20-ft fuel-yard device rack.

Assembly / hardwareQuantityBasisDrawing use
Horizontal trapeze racks538-ft max spacing53 strut crossbars
All-thread rods1062 per trapezeField-cut length
Trapeze attachment hardware106 clamps · 212 nuts · 212 washers2 support points per rackVerify structure type
Vertical strut racks1088-ft max spacing108 RMC clamps
Fuel-yard rack posts / beams6 posts · 2 beamsDevices at +20 ftStructural steel
Rack foundations6 base plates · 24 anchors4 anchors per postFinal engineering required
Rack connection hardware12 plates · 48 bolts2 plates per post4 bolts per plate
Device mounting brackets4End-rack device groupFD · YB · RB · HS

Quantities are a conceptual coordination allowance, not a sealed structural design. Confirm rack member sizes, wind loading, foundations, anchor embedment, corrosion protection, structural attachment types, rod lengths, seismic requirements, and manufacturer-specific device brackets before fabrication or purchase.

05

Routing basis

Every device box connects to one of two segregated 3/4-in. RMC systems. The gas detectors form one continuous series circuit.

  1. 01

    Detection RMC

    Gas monitors and flame detectors share one 3/4-in. RMC system. All 17 gas-detector points are shown in one continuous series path, including the six-point B307B group and two east/fuel-yard LEL points.

  2. 02

    B307B underground connection

    B307B is shown with transparent walls and an east–west center partition: control room on the project-facing south half and electrical room on the far north half. Separate detection and notification conduits rise at the safety-system panel, run underground to the B307 main junction box, then continue to their field circuits.

  3. 03

    Notification RMC

    Beacons, strobes, and horns use a separate 3/4-in. RMC system with parallel column drops and individual box connections.

  4. 04

    Exterior pipe-rack pathway

    The two systems transition separately at the east edge of B307 and continue in the orange enclosed cable tray. The tray drops at the 90-degree turn and continues to the end of the fuel yard at approximately +3 ft above grade. All device connections outside the tray remain in vertical RMC.

Coordination note

Conceptual model—not construction-issued BIM.

Final route lengths, equipment coordinates, tray loading, classified-area seals, and mounting details require field verification and approved construction drawings.